Client
Federal Government
Project Type
Exterior Renovation
M-50 Slab Repair
Front entrance concrete rehabilitation at Building M-50, including replacement of the existing exterior slab with new waterproofing, concrete steps, retaining wall, ramp, and stainless steel railing. Completed through the winter months, the project required heat containment enclosures and temporary heating to maintain schedule and quality. The work modernized a key building entrance while improving durability, safety, and long-term performance in an active institutional setting.
During
During
During
During